Construction of the Ozon Arena was started in April 2013 and completed in September 2016. The capacity of the sports facility’s bowl is 33 000.

The roof of a special cable-stayed structure covers all spectators’ seats. The stands are equipped with an infrared heating system for maximum comfort of supporters in cold weather.

Location:Krasnodar, Russia
Project Description: Fabrication of the roof membrane and interior membrane for a 33,000-seat stadium
Quantities:22,265 m2 of roof membrane made of PTFE-coated glass fabric
15,400 m2 of interior membrane made of PTFE-coated glass fabric mesh
Construction period:August 2014–January 2015 (manufacturing)
May 2015–December 2015 (on-site installation)

Please contact us by phone or email!

+36 96 550 700
0+
years of experience
0
countries
0
projects per year

References

Our featured projects help you decide whether...

In August 2010, a contract was signed for the membrane facade cladding of the newly constructed stadium

Construction of the Ozon Arena was started in April 2013 and completed in September 2016. The capacity

Audi – Design, fabrication, and on-site assembly of logistics storage tents. Our company, GRABOPLAN Tent Manufacturing and

At the Nagyerdei (“Loki”) Stadium in Debrecen, the primary function of the roof structure is to provide

The expansion of Berlin-Schönefeld Airport—which has been under expansion since 2006—by approximately 970 hectares into the new

Covered area: 29,200 m² exterior roof, 9,650 m² interior roof
Materials used: PVC/PVDF-coated PES fabric, high-tensile-strength technical textile